For construction and trade businesses

Tier-1 ready compliance for
Australian construction.

SWMS, WHS policy, hazard registers and inductions drafted against SafeWork NSW, WorkSafe Victoria and WHSQ — the same standard tier-1 builders demand before they let you on site.

Aligned with SafeWork NSW · WorkSafe Vic · WHSQ20-minute generationBranded PDF + ZIP
120+
Page-equivalent output, per pack
12
High-risk activities covered by SWMS
8
State & territory WHS regulators tracked

What we generate for you

Every hazard, every service — mapped to a clause.

Tell us what you do and what could go wrong. We draft a SWMS, policy clause or register entry against each one — with the regulatory reference embedded.

Hazards covered

  • Working at heights
    SWMS · Working at heights (WHS Reg 78–82)
  • Manual handling
    SWMS · Hazardous manual tasks (WHS Reg 60)
  • Power tools
    Plant & equipment safe operating procedure
  • Asbestos exposure
    SWMS · Asbestos (Code of Practice — How to Manage and Control Asbestos)
  • Confined spaces
    SWMS · Confined space entry (WHS Reg 66–77)
  • Trenching & excavation
    SWMS · Excavation work ≥1.5m (WHS Reg 304–305)
  • Hot works
    SWMS · Hot works & spark generation
  • Dust & silica
    SWMS · Crystalline silica (WHS Reg 529CA + air monitoring)
  • Noise
    Hearing protection program (WHS Reg 56–59)
  • Mobile plant
    SWMS · Mobile plant operation (WHS Reg 213–214)
  • Falling objects
    SWMS · Falling objects (WHS Reg 54)
  • Electrical
    SWMS · Working with electricity (WHS Reg 140–165)

Services covered

  • Site supervision
    Principal contractor duty holder schedule + inspection checklist
  • Tiling
    SWMS · Tiling, including silica dust and manual handling
  • Bricklaying
    SWMS · Masonry & bricklaying with silica controls
  • Concreting
    SWMS · Concrete pours, pump operation and slump testing
  • Carpentry
    SWMS · Framing, formwork and timber handling
  • Plumbing
    SWMS · Plumbing & gas, with confined space module
  • Electrical
    SWMS · Electrical isolation and test-and-tag procedure
  • Roofing
    SWMS · Roof work ≥2m with edge protection module
  • Demolition
    SWMS · Demolition (WHS Reg 142A) + asbestos screening
  • Excavation
    SWMS · Excavation, shoring and ground support
  • Painting
    SWMS · Painting, ventilation and hazardous substances
  • Glazing
    SWMS · Glazing, lifting frames and edge work

Document set

Eight documents.
Tailored to your trade.

Construction packs lead with WHS, SWMS and a hazard register sized for high-risk work — every reference points back to the Model WHS Regulations and the relevant state code of practice.

  • 01

    WHS Policy

    core

    Drafted against the Model WHS Act and your state regulator, with construction-specific duty holder clauses for PCBUs, principal contractors and HRCW.

  • 02

    Safe Work Method Statements

    operations

    One statement per high-risk construction activity you perform — height, excavation, demolition, hot works, confined spaces — each citing the WHS Regulation reference.

  • 03

    Incident & Hazard Register

    operations

    Incident & hazard register prefilled with construction-specific notifiable incident categories, including dangerous incident triggers under s.37.

  • 04

    Emergency Response Plan

    operations

    Site-aware emergency plan covering trench rescue, scaffold collapse, electrical contact and severe weather stop-work thresholds.

  • 05

    Employee Code of Conduct

    people

    Behaviour standards aligned with principal-contractor inductions and Fair Work modern award expectations.

  • 06

    Privacy Management Plan

    core

    APP-compliant privacy plan covering subcontractor records, biometric site sign-in and CCTV.

  • 07

    Anti-bullying & Harassment

    people

    Respect-at-work clauses calibrated for site dynamics, drawing on the Fair Work Commission's anti-bullying jurisdiction.

  • 08

    Training Register

    operations

    Register prepopulated with white card, EWP, working-at-heights and HRWL refresher cycles.

Operator on PolicyPack

We needed a WHS system for a tier-1 builder tender. PolicyPack generated a 120-page, fully branded, hyper-specific pack in 15 minutes. We won the tender.
Mark T.
Director, Northside Tiling

Single Pack

$199one-time, all inclusive

Everything you need to pass the audit today — WHS, SWMS, privacy plan, conduct, incident register and emergency plan, branded for your business and tailored for construction & trades.

FAQ

Questions specific
to construction & trades.

The five or six things every operator in this industry asks us before getting started.

  • Yes — every construction pack is built to the same SWMS, hazard register, and induction structure that tier-1 head-contractors require for principal-contractor onboarding. Customers regularly win tenders with PolicyPack output as the basis of their compliance evidence.

  • All eight Australian WHS regulators — SafeWork NSW, WorkSafe Victoria, WHSQ, WorkSafe WA, SafeWork SA, WorkSafe Tasmania, WorkSafe ACT and NT WorkSafe. The pack adopts the local Code of Practice where it diverges from the model laws.

  • Yes. One SWMS per HRCW item on your project — working at heights ≥2m, demolition, excavation ≥1.5m, confined spaces, hot works and asbestos — each citing the relevant WHS Regulation clause and including hazard controls and sign-off blocks.

  • Yes. We include a crystalline silica control plan aligned with WHS Reg 529CA and an asbestos register and management plan referencing the Code of Practice. If you don't handle asbestos, we'll generate a screening procedure instead.

  • Every cover sheet, header and footer pulls your business name, ABN, logo and brand colour. The output is camera-ready for principal contractor onboarding portals like Rapid Global, OnSiteTrack and Avetta.

  • Generation takes around 20 minutes. The branded PDF and ZIP are delivered as soon as it finishes — ready to upload to a contractor onboarding portal or hand to your site foreman.

Ready when you are

Win the next tier-1 tender.
Not the next compliance argument.

Engineer a complete construction pack — WHS, SWMS, registers and inductions — before lunchtime.